Step 1 Design Meeting  section image

Step 1 Design Meeting

You will meet with a Hive Homes consultant to discuss your new home goals, timeframes and budget, because everyone is different, we help personalise our designs to suit your needs.

Step 2 Estimate Proposal  section image

Step 2 Estimate Proposal

Here at Hive Homes, we make sure our estimates are accurate so you can be confident while working through the pricing process with banks and brokers.

We make sure to educate and eliminate any hidden costs so you can enjoy the process.

Step 3 Moving Forward  section image

Step 3 Moving Forward

You are happy with your home, specification and price you can now sign an authority to proceed form

We take a preliminary payment to progress to the next stage
We then start the design process

- Design fee
- Geo report
- Topo for land
- SW Report
- Engineering
- Other reports if needed

Step 4 Tests and Reports section image

Step 4 Tests and Reports

At this stage we conduct any testing required to provide a completed quote. This not only ensures your home is safe but meets the NZ building standards.

This process also allows us to pick up any unforeseen hidden costs so you have no surprises.

Going to contract with these unknown factors can be a big risk, here at Hive Homes we make sure we keep you safe from any big variations during your build by getting all the information needed.

Step 5 Design and Engineers  section image

Step 5 Design and Engineers

At Hive Homes we prepare a full 3D visual design for you to look at and go over in person to make sure you are 100% happy before you head to contract.

Once you have signed off your design we then submit this to our experienced draftsmen and engineers to finalise the design to move towards contract.

- Site plan
- Floor plan
- Elevations
- Window schedule

Step 6 Build Contracts  section image

Step 6 Build Contracts

We can meet with you in our display office or your home to sign a Hives Homes build contract

You will have 10 working days to get approval from your lawyer and bank for finance, if you need more time we can give an extension

Once lawyers and banks have given you the go ahead 10% deposit is due here

Step 7 Colour Consult  section image

Step 7 Colour Consult

The time has come to meet our very talented interior designer, who will bring all your colour, texture and product choices together

To make it easy on the same day, an electrical consult is booked so you can go through where lights and power points will be located on plan, this helps if you are wanting to discuss any feature lights or automated systems

You will be booked in for your kitchen consultation on the same day or another day that suits

Step 8 Council Approval  section image

Step 8 Council Approval

After checking all your paperwork, we will now submit your plans to council for building consent, Once your building consent has been approved we can then start breaking ground.

Step 9 Slab Down  section image

Step 9 Slab Down

After building consent is issued, your construction manager will be able to give you an estimated date for earthworks to start

Once earthworks has been done your slab foundation will be going down next, we will book you in for your slab ceremony

15% Slab down payment is due here

Step 10 Frames Up  section image

Step 10 Frames Up

Frames start to go up which will give you a real feel for your living spaces

15% Frame stage payment is due here

Step 11 Roof On  section image

Step 11 Roof On

Now that the frames and trusses are on your new home it is ready for the roof to go on.

20% Roof on payment is due here

Step 12 Lock Up Stage  section image

Step 12 Lock Up Stage

Here your home will become secure as the roof, windows, cladding, and external doors are all installed

You will have a real external view of what your new home will look like

15% Lock up payment is due here

Step 13 Finishing Stage  section image

Step 13 Finishing Stage

This is the stage when all your exciting product choices and colours get installed and all the finishing touches

- Kitchen
- Flooring and tiles - Bathrooms
- Paint

20% Finishing payment is due here

Step 14 Handover Stage  section image

Step 14 Handover Stage

Congratulations your new home is now finished. After a good clean, and we have inspected the property from top to bottom and your last stage payment has been paid, we are ready to handover your keys

5% Completion payment is due here

Our End to End Process

At Hive Homes, we take pride in our comprehensive, end-to-end process that sets us apart from traditional builders

Download Our Process
Our End to End Process  cover image
Our End to End Process

Please fill the form below to download

Download
Hive Homes Process

At Hive Homes, we take pride in our comprehensive, end-to-end process that sets us apart from traditional builders. We focus on the necessary engineering, such as foundations, steel, retaining walls, and land reports, to eliminate hidden costs and avoid any guesswork.

Download Our Process
Hive Homes Process cover image
Hive Homes Process

Please fill the form below to download

Download
Where We Build background image

Where We Build

Hive builds homes in: Karaka, Clarks Beach, Glenbrook, Patumahoe, Waiuku, Pukekohe, Bombay, Tuakau, Pokeno, Te Kauwhata Clevedon, Auckland Manukau, Papakura, Takanini, All of Franklin

Start your new home journey with hive today
Enquire